The disciplines a commission runs through

Listed in the order they happen. Casting, fabrication and carving sit at the same point in the sequence — they are alternatives, and the material chooses between them.

  • 3D Design

    Concept development, digital sculpting and verified visualisation.

  • Structural Engineering

    Signed calculations, wind analysis and anchoring design for every piece.

  • Bronze Casting

    Lost-wax and sand casting in silicon bronze, welded and chased by hand.

  • Metal Fabrication

    Laser cutting, forming and welding in stainless, corten and aluminium.

  • Stone Carving

    Hand carving in Carrara and selected marbles — no resin, no reconstituted stone.

  • Finishing

    Polishing, patination, powder coating and gelcoat spraying to sample.

  • Crating and Freight

    Export crating, documentation and freight to the delivery port.

  • Installation

    Direct installation, or supervised local rigging where we do not travel.

How a commission runs, in order

Design and engineering overlap on most commissions; nothing downstream of them does. Trial assembly applies to work that ships in sections.

Stages run left to right. Where the drawing branches, one route applies rather than all three — the material settles it at design stage.
  1. Brief and design. Sight lines, viewing distance, setting and programme settled first, then concept directions, a maquette and a production model you have approved.
  2. Engineering and approvals. The wind case for the actual position, the internal frame, the anchoring and the base loading plan — issued signed, early enough for whoever approves the design locally to check it.
  3. Making the piece. One route, not three. The material settled at design stage decides whether the piece is cast, fabricated or carved. One of:
    • Bronze Casting
    • Metal Fabrication
    • Stone Carving
  4. Finishing and inspection. Patina, polish or coating applied against a sample panel you signed off, then measured back against that panel before it is accepted.
  5. Trial assembly — sectional work only. Sectional work is built complete, match-marked and photographed before it is taken apart again. Alignment problems are found here rather than under a crane.
  6. Crating and freight. Cradles and bracing designed for the specific piece and route, export documentation issued ahead of sailing, and the shipment tracked to arrival.
  7. Installation and handover. Access requirements, lifting plan, setting and alignment, on-site finishing where the piece was sectioned, then the torque records, photographs and maintenance schedule.