In the workshop

What we do

Concept development runs in parallel across two or three directions so a client is choosing between real options rather than approving the only one presented. Forms are sculpted in ZBrush where the subject is organic and modelled in Rhino with Grasshopper where it is geometric or parametric, then reconciled into a single watertight NURBS or mesh model that the fabrication and engineering teams both work from. Visualisation is done in Blender Cycles, set into the client’s own site photography at the correct camera height and lens length, because a render at eye level from a plan viewpoint misrepresents scale in a way that causes expensive surprises later. Where planning consent is involved we produce verified views to the authority’s specified viewpoints and supply the model in the format the planning consultant requires. Physical maquettes are printed on our own SLA machines at 1:20 or 1:10 and hand-finished; for civic work they are produced robustly enough to be handled at public consultation. Models are held to a 0.1 millimetre tolerance for print and are checked for manifold geometry, wall thickness and draft before any tooling path is generated. Files are issued in STEP, IGES, OBJ and DWG as required, and every revision is versioned so that the model the foundry works from is provably the model the client approved.

Stage by stage

How it runs

Typical durations for this stage. They are what we programme against, not best cases.

  1. Brief and site analysis

    Sight lines, viewing distance, programme and budget band established before any form is drawn.

    Typical duration: 1 week

  2. Concept directions

    Two or three developed directions with indicative bands, presented as visualisations in your own site photography.

    Typical duration: 2–3 weeks

  3. Maquette

    The selected direction printed and hand-finished at 1:20 or 1:10 for physical review.

    Typical duration: 1–2 weeks

  4. Developed model

    Watertight production model reconciled with engineering, issued for fabrication.

    Typical duration: 2 weeks

Plant and codes

Equipment and standards

Named machinery, the codes we work to, and the certifications behind them.

The plant list and workshop headcounts are not published yet. Ask us and we will send the current equipment register.

Ask for the register

In the meantime

At handover

What you receive

Drawings, calculations, files and certificates issued as part of the commission — not on request.

Concept visualisations, verified views for planning, physical maquette, production model in your chosen exchange format, and a versioned revision history.

Need 3d design on a live project?

Send the drawing, the model or the photograph you have. We will tell you what is achievable at that scale, what it will take, and what it will cost.

We respond to every quote request within one working day